vRSLCM deployment – Failed to send http data – Solved

Yesterday I spun my wheels a bit on an issue I encountered whilst trying to deploy vRealize Suite Life Cycle Manager (vRSLCM) via the vRealize Easy Installer. I downloaded the ISO, opened it up, navigated to the vrlcm-ui-installer folder and clicked on the installer.exe. I selected the Install option, then went through the steps to roll-out the vRSLCM product, as shown below. Almost immediately on completing the deployment I hit this error: “Failed to send http data”: I examined the logs and this is what I found: 2020-07-13T13:49:45.201Z – info: output:PROGRESS 2020-07-13T13:49:50.307Z – info: output: 2020-07-13T13:49:50.310Z – info: output: ERROR…

Getting started with VCF Part 14 – Connecting vRA to NSX-T WLD (alternate method)

In my most recent VMware Cloud Foundation post (part 13), I highlighted the fact that if you used NSX-T as the networking platform for your workload domain (WLD), you could not attach vRealize Automation (vRA) to such a WLD via SDDC Manager. In that previous post, I showed how to manually deploy the vRA proxy agents on the Proxy VMs. These Proxy VMs were already deployed via SDDC Manager as part of the overall vRA deployment through SDDC Manager, but the agents were not installed at this point. If NSX-V was used as the networking platform for the WLD, then…

Getting started with VCF Part 13 – Connect vRealize to WLDs

I’m still on my VMware Cloud Foundation v3.9 journey. My latest task was to connect my vRealize Components to my Workload Domains (WLDs). In part 2 I deployed vRealize Log Insight (vRLI) and vRealize Operations (vROps), and then in part 3 and part 4, I rolled out vRealize Automation. Now I wanted to connect them to the WLDs that I had rolled out previously. SDDC Manager makes this really easy. In just a couple of clicks I had connected vRLI and vROps to both VI WLDs. However, on trying to connect my vRealize Automation (vRA) 7.6 to my WLDs, I…

Getting started with VCF Part 5 – Commission Hosts

At this stage, we’ve done quite a number of tasks related to VMware Cloud Foundation (VCF). Our management domain is up and running, and we also have the vRealize Suite of products deployed (vRealize Suite Lifecycle Manager, vRealize Log Insight, vRealize Operations Manager, and of course vRealize Automation). Our next step is to commission some new ESXi hosts so we can create our very first VI Workload Domain (WLD) which we can start using for production purposes. This post will look at the steps involved in commissioning the hosts. Note that in this example, I am going to commission ESXi…

Getting started with VCF Part 4 – vRA Deployment

After taking care of all of the prerequisite steps highlighted in my VMware Cloud Foundation Part 3 post, we are now ready to deploy vRealize Automation (vRA) via vRealize Suite Lifecycle Manager (vRSLM) in the VCF SDDC Manager. This will be a relatively shorter “show and tell” post, which will take you through the deployment steps. It will also show you how you can monitor the progress of the vRA deployment. The complete deployment does take some time since there are quite a number of virtual appliances and virtual machines that need to be rolled out for vRA (11 in…

Getting started with VCF Part 3 – vRealize Automation Prerequisites

Continuing on my journey of ramping up on VMware Cloud Foundation (VCF), my next step is to go through the deployment of vRealize Automation. This is again done via the vRealize Suite Lifecycle Manager (vRSLM). We’ve already seen how to deploy out vRealize Operations through vRSLM in part 2. And in part 1, we saw the initial VCF management domain deployment. In this post we will take a detailed look at what needs to be put in place in order to be able to deploy vRealize Automation (vRA). Now, there are quite a number of prerequisites needed before we can…

Getting started with VCF Part 2 – vRealize Suite

Following on from my first post on getting started with VMware Cloud Foundation (VCF), the next thing that you will probably want to do is configure the vRealize Suite in SDDC Manager. Now, as part of the initial VCF deployment, vRealize Login Insight is already deployed.  Therefore in this step, we will deploy two components – the vRealize Suite Lifecycle Manager and vRealize Operations. There are two pieces of information that we will need before we start. The first of these is the ‘Bill of Materials’ to tell us which versions of software are required for our particular release of…